Since the dry fitting of engine and transmission had already been done. Recent updates are that the mounts for engine and transmission have been finalized as the differential job was in progress lately.
Due to the smaller engine bay, we’re having some issues with putting even the custom slim radiator in. Engine has been taken out and put back several times so far and I believe soon we would get done with this too.
The picture above is an old one; of the time when the engine was dry-fitted only.
Due to severe back-ache, I’m avoiding a long drive. In a week, may be this weekend, I’d go to Islamabad and pay Red Storm a visit. Below are more old pictures, I would soon upload the new pictures and share with you here.
Phase III: The Big Job in Process
[click the picture to view the gallery]
